Choose an inventory report
Console: Reports → Inventory reports. Confirm the working location and
period before reading the figures. Business-wide valuation, profitability,
month-end, and cross-location views have separate entries under Reports.
Check date range, location, units, cost coverage, and estimated labels. A failed
query, incomplete recipe, or uncounted stock is not a healthy zero. Follow the
report's recovery link to its source records and verify corrections there.
Exports contain restaurant operational information; share them only with people
authorised for that business and period.
Start with Cost Pulse
Open Overview to see Cost Pulse for the selected location. Use it to
choose the report to investigate, then check the underlying records before
changing prices, staffing, or stock.
- Confirm the working location.
- Choose Week, Month, or Quarter. These cover the preceding seven
days, one month, or three months up to the time the range is set; they are
not calendar-week, calendar-month, or closed accounting-period totals.
- Choose All day or a configured service shift where available. The shift
narrows Prime cost, Food cost, and Avg spend. Menu and
Margin leak continue to cover the whole selected period.
- Wait for the figures to finish loading. A period change can briefly retain
the previous figures while the new request completes.
- Open the relevant tile. Check the period and shift again in the detailed
report: the overview's selections are not carried into that page.
| Tile | What to investigate |
|---|
| Prime cost | Food and labour relative to net sales. Incomplete costs means recipe coverage needs review before using the percentage. |
| Food cost | Actual food cost and its variance. Missing movement costs or insufficient theoretical cost can withhold the value. |
| Menu | Push and Fix suggestions based on item margin. Review sales volume and recipe coverage in Menu Engineering before acting. |
| Margin leak | Recorded shrink, waste, and comps. ≥ marks a lower bound when uncosted comps are excluded. |
| Avg spend | Average spend per completed order and the order count. Opening this tile takes you to Sales Mix. |
If there are no configured service shifts, Set up shifts opens location
settings. Set these up to match the restaurant's services with the manager;
changing a report filter does not change rotas or staff shifts.
A dash or No data is not zero cost. This overview also uses that treatment
when a report request fails. Open the detailed report to distinguish missing
activity, incomplete costs, and a load error. No leak describes recorded,
costed activity; it does not establish that no stock was physically lost.
To recover missing figures, use stock costs,
recipe setup, and stock movements.
Preserve the location, period, shift, warning, and affected record for the stock
lead.